เกจวัดแรงดันสูง and move control know-how firm Circor Pipeline Engineering has supplied a customer with a speedy opening closure (ROC) for a 48-in gasoline filter vessel inside 10 weeks.
A ROC offers a quick opening access level to pipelines or pressure vessels, for the installation or removing of kit.
Built by Pipeline Engineering in Catterick, UK, the 48-in ASME U-Stamp large ROC closure needed to be delivered to the client in Houston, Texas in 10 weeks. It was built and delivered on time using the new massive Vertical Turning Center (VTC) installed in Catterick in 2020 to scale back manufacturing lead time.
Following the delivery, Pipeline Engineering provided support with installation and welding from its Houston facility.
The closure has been equipped with the new CIRCORSmart tag for traceability, document access and easy customer assistance when it goes into operation.
Share